International Journal of Mechanical and Production Engineering (IJMPE)
.
Follow Us On :
current issues
Volume-12,Issue-1  ( Jan, 2024 )
Past issues
  1. Volume-11,Issue-12  ( Dec, 2023 )
  2. Volume-11,Issue-11  ( Nov, 2023 )
  3. Volume-11,Issue-10  ( Oct, 2023 )
  4. Volume-11,Issue-9  ( Sep, 2023 )
  5. Volume-11,Issue-8  ( Aug, 2023 )
  6. Volume-11,Issue-7  ( Jul, 2023 )
  7. Volume-11,Issue-6  ( Jun, 2023 )
  8. Volume-11,Issue-5  ( May, 2023 )
  9. Volume-11,Issue-4  ( Apr, 2023 )
  10. Volume-11,Issue-3  ( Mar, 2023 )

Statistics report
Apr. 2024
Submitted Papers : 80
Accepted Papers : 10
Rejected Papers : 70
Acc. Perc : 12%
Issue Published : 130
Paper Published : 2388
No. of Authors : 6802
  Journal Paper


Paper Title :
Cost Reduction Through Waste Management in Auto Parts Industry: A Case Study

Author :Gurinder Singh Brar, Abhishek Thakur

Article Citation :Gurinder Singh Brar ,Abhishek Thakur , (2016 ) " Cost Reduction Through Waste Management in Auto Parts Industry: A Case Study " , International Journal of Mechanical and Production Engineering (IJMPE) , pp. 30-35, Volume-4,Issue-12

Abstract : Industrial waste elimination is a major challenge that is faced by all the companies in the day-to-day activity of manufacturing systems. There are seven types of industrial waste in lean systems such as movement, waiting, overproduction, inventory, over-processing, defects and transportation. Every industry faces same type of waste that occurs in day-to-day production activities. Muda directly or indirectly affect the production cost. Poor production cost is considered as major problem in case industry. The objective of this study is to reduce the muda from side stand process line. In this study, two techniques are used to achieve the objectives. Value stream mapping (VSM) is a state of the art technique used to find out the major flaws in side stand process and ECSR (Eliminate Combine Simplify Reduce) technique is applied to identify the opportunities for saving. Along with the application of VSM and ECSR techniques, corrective actions are taken to reduce the muda from process flow of side stand from which higher process capability is achieved. It was observed that wastage of material`s movement was reduced by 94.4%. As proposed in model, the Work in Process (WIP) inventory has been reduced by 76.4% and workforce by 15.38%. Further, it would lead to the profit of Rs. 15738.4 per month. Keywords— Value Stream Mapping (VSM), TAKT Time, Work In Process Inventory (WIP), Kaizen.

Type : Research paper

Published : Volume-4,Issue-12


DOIONLINE NO - IJMPE-IRAJ-DOIONLINE-6416   View Here

Copyright: © Institute of Research and Journals

| PDF |
Viewed - 67
| Published on 2017-01-17
   
   
IRAJ Other Journals
IJMPE updates
Volume-12,Issue-1 (Jan, 2024 )
The Conference World

JOURNAL SUPPORTED BY